Hair Extensions Wholesale Manufacturers
Factory with container-scale capacity, reserved production windows, and multi-site split shipping for distributor networks and import houses.
Buyers Who Ship by the Container
Distributor networks, import houses, and chain buyers moving volume that other suppliers cannot handle. Each account type below has a documented onboarding path with Cici, our head of sales. Expect a 30-minute discovery call before your first PO so expectations around MOQ, lead time, and documentation are set in writing.
Regional Distributors
You service 30+ salon accounts across a region. You buy by the pallet, not the pack.
Import Houses
You clear customs, warehouse, and redistribute. You need documented supply from a real factory.
Chain Buyers
You buy for a chain of stores or salons. Consolidated purchasing across sites requires factory coordination.
Group Purchasing
You aggregate demand across smaller wholesalers. Container-level pricing needs container-level factory time.
Government Contracts
Large-scale procurement contracts requiring documented factory verification and audit trail.
What Fits in Your Shipment
Concrete numbers for full-container planning. Deepest per-unit pricing tier applies here. Numbers below are averaged across the 60+ FCL shipments we loaded in H1 2026. Freight rates fluctuate with carrier capacity; your quote is locked at PO issue date to protect you from mid-production rate movement.
Regional Distributor
- Capacity8,000–12,000 packs per container
- Volume mix60% tape-in / weft, 40% clip-in / halo
- Production lead25–30 days from PO confirmation
- Freight25–35 days sea to major ports
- DocumentationCI, PL, COO, master batch report
Import House / Chain
- Capacity18,000–25,000 packs per container
- Volume mixAny SKU combination
- Production lead30–35 days from PO confirmation
- Freight25–35 days sea to major ports
- DocumentationFull customs package plus batch traceability
Lock your factory time in advance
Annual accounts committing to 4+ containers per year unlock reserved monthly or quarterly production slots.
Manufacturing hours reserved before your PO arrives — no queue entry.
High-runner colors held in inventory for your account only.
Container space pre-booked with our forwarder network.
Direct line to production manager for urgent adjustments.
One Order, Multiple Destinations
Distributors with regional networks split one container across up to 8 warehouses. We handle the coordination. Split-ship structure below is handled by our shipping desk as a single consolidated workflow, not as separate POs. One invoice, one QC trace, separate tracking per destination.
Qingdao
Example split — actual destinations and quantities set per PO
Master Purchase Order
One master PO covering total production. Sub-PO for each split destination.
Commercial Invoice Set
Separate CI per destination for customs, cross-referenced to master.
Packing List Set
Destination-specific packing lists with SKU breakdown per site.
Origin Certificate Set
Certificate of Origin per destination for regional tariff compliance.
Master Batch Report
Unified batch traceability across all destinations for QC consistency.
Freight Coordination
Consolidated or split freight per destination, with unified tracking.
Container-Ready SKU Mix
Every product available for container-scale ordering. Mix within one shipment. Our full range is sold under one wholesale account, with combined shipping and consolidated invoicing. Buyers running mixed-SKU reorders save roughly 8–12% in logistics overhead vs. multi-vendor sourcing.
Tape In
High-density pack format.
Genius Weft
Popular for chain accounts.
Keratin Tip
Long-wear salon channel.
I-Tip
High-volume distributor SKU.
Clip In
Retail-ready pack format.
Halo
Entry customer SKU.
Ponytail
High-margin distributor line.
Bulk Human Hair
Container-friendly density.
Container Prep in Action
Pallet building, packing, and staging for full-container shipments. All imagery is from our actual production floor and finished-goods inventory. No stock photography, no renderings. Image resolution and licensing available on request for your marketing use.
Not Yet at Container Scale?
Standard wholesale program handles orders from 50 packs to 5,000 packs with tier pricing.
- MOQ from 50 packs per SKU
- Tier discounts at 100, 300, 500 packs
- Mix color, length, product type
- Express and air freight options
- Full payment upfront
Ship Your Brand by the Container
Container-level private label with reserved production slots and consolidated documentation.
- Full private label customization
- Reserved production window included
- Multi-destination split shipping
- Master + destination-level docs
- Custom orders require full payment upfront
How Distributors Ship With Us
Anonymized case snapshots at container scale. Snapshots below are structural (how accounts use us), not individual company names. Confidentiality on buyer identity is standard across our 400+ active account base; your account enjoys the same confidentiality.
Quarterly 40ft Container
Regional distributor books quarterly 40ft high-cube. 22,000-pack mix across tape-in, weft, and keratin tip. DDP to LA warehouse.
Split-Ship 8 Destinations
Multi-country chain splits container across 8 warehouses. Unified master PO with 8 sub-PO packages. Documentation cross-referenced.
Reserved Annual Contract
Import house reserves 4 containers per year. Production windows locked in advance. Freight consolidated with their forwarder.
Container-Scale Delivery Windows
Standard freight windows from Qingdao port to major destination regions. Freight structure below handles DHL / FedEx / UPS express for small POs; dedicated forwarders for air cargo (50 kg+) and ocean (LCL / FCL). Shipping desk produces all documents in-house.
| Region | 20ft Container | 40ft Container | Split-Ship Options |
|---|---|---|---|
| North America (US, Canada) | 28–35 days | 28–35 days | Up to 4 destinations |
| Europe (UK, EU) | 32–42 days | 32–42 days | Up to 4 destinations |
| Australia & NZ | 22–32 days | 22–32 days | Up to 3 destinations |
| Middle East | 26–36 days | 26–36 days | Up to 3 destinations |
| Latin America | 36–46 days | 36–46 days | Up to 2 destinations |
Production time additional · 25–35 days before freight starts
Container-Scale Buyer Questions
Questions below are the ones Cici answers by email every week, in the order of frequency we see them. If your question is not here, email her — we add new entries as new questions emerge.
Q1What container volume can you produce per order?
Q9What container sizes do you commonly load for wholesale?
Q13How do you calculate freight for a mixed-SKU container?
Q14What is your maximum FCL loading capacity per production run?
Q15How do you handle currency risk on multi-month wholesale contracts?
Q16Do you offer bonded warehouse or free-trade-zone options?
Q10How do you handle FOB vs CIF vs DDP freight terms?
Q11Can you split-ship a container to more than 4 destinations?
Q12What is included in your standard commercial documentation?
Q2Can you reserve a production window for annual contracts?
Q3Do you split-ship one order to multiple locations?
Q4What is your production lead time for full container orders?
Q5How do you consolidate documentation across split shipments?
Q6Are samples free for large wholesale orders?
Q7What payment terms apply to container orders?
Q8Can you handle freight consolidation with our other suppliers?
Deep Dives From The Factory Floor
Long-form guides, market analysis, and QC deep-dives — written by our sales desk, technical team, and QC lab.
How To Choose Between Tape-In And Hand-Tied Weft For Your Salon
A side-by-side of the two most reordered SKUs in our factory: install time, wear cycle, salon economics, and which client base fits which method.
Read Article →Behind The Scenes: 4 QC Gates That Sign Off Every Batch
Intake, color, assembly, pack — a walk through the four QC gates that every VeeJeen batch passes and what happens when a number misses spec.
Read Article →2026 Hair Extension Market Trends B2B Buyers Should Know
Five directional shifts we saw across 320,000 packs shipped this year: invisible tape, hand-tied growth, cold-bond return, PL acceleration, and adhesive surge.
Read Article →Private Label In 30 Days: A Realistic Timeline For New Brands
The six-phase incubation path from discovery call to first PO delivery, with milestones, common blockers, and what to prepare before your kickoff.
Read Article →IATA-DG Certified Adhesive Shipping Explained For Distributors
What our shipping desk does per adhesive lot: DGD paperwork, flash-point testing, carrier-ready packaging, and the docs your customs broker will ask for.
Read Article →Cold-Bond vs Fusion: Which Installation Method Fits Your Salon
Nano ring, micro ring, K-tip, U-tip, I-tip: the trade-offs on install speed, wear life, hair damage, and reinstall cycles for salons deciding between camps.
Read Article →